{"id":1332,"date":"2023-02-27T10:20:40","date_gmt":"2023-02-27T10:20:40","guid":{"rendered":"https:\/\/d-tacs.com\/wrong-construction-drawings-lead-to-higher-costs-of-rebuilding-afsluitdijk\/"},"modified":"2023-02-27T13:31:01","modified_gmt":"2023-02-27T13:31:01","slug":"wrong-construction-drawings-lead-to-higher-costs-of-rebuilding-afsluitdijk","status":"publish","type":"post","link":"https:\/\/d-tacs.com\/en\/wrong-construction-drawings-lead-to-higher-costs-of-rebuilding-afsluitdijk\/","title":{"rendered":"Wrong construction drawings lead to higher costs of rebuilding Afsluitdijk"},"content":{"rendered":"<p>Wrong construction plans led to a debacle in the rebuilding of the Afsluitdijk. By properly incorporating commissioning right from the design phase, one can help ensure that these types of setbacks do not have to occur.<\/p>\n<p>The expected cost increase is already \u20ac120 million for which the State is making a reservation. The money is needed for the new design drawings that had to be made after it emerged in the fall that Rijkswaterstaat and the contractors were working with the wrong drawings in the design of the new locks at Den Oever. The Department of Public Works decided to change the designs and is footing the bill. One can hope that this is not just for adjusting the drawings alone. Surely you can draw a lot of hours for that;-)<\/p>\n<p>Too bad this has to be paid for from our tax dollars. We can think of much more useful things for that.<br \/>\n<a href=\"https:\/\/www.linkedin.com\/feed\/hashtag\/?keywords=commissioning&amp;highlightedUpdateUrns=urn%3Ali%3Aactivity%3A6808295730386653184\">#commissioning<\/a> <a href=\"https:\/\/www.linkedin.com\/feed\/hashtag\/?keywords=faalkosten&amp;highlightedUpdateUrns=urn%3Ali%3Aactivity%3A6808295730386653184\">#fail costs<\/a> <a href=\"https:\/\/www.linkedin.com\/feed\/hashtag\/?keywords=controleren&amp;highlightedUpdateUrns=urn%3Ali%3Aactivity%3A6808295730386653184\">#checking<\/a> <a href=\"https:\/\/www.linkedin.com\/feed\/hashtag\/?keywords=dtacs&amp;highlightedUpdateUrns=urn%3Ali%3Aactivity%3A6808295730386653184\">#Dtacs<\/a> <a href=\"https:\/\/www.linkedin.com\/feed\/hashtag\/?keywords=verbeteren&amp;highlightedUpdateUrns=urn%3Ali%3Aactivity%3A6808295730386653184\">#improve<\/a><\/p>\n<figure><img decoding=\"async\" src=\"https:\/\/d-tacs.com\/wp-content\/uploads\/2021\/06\/image-1024x217.png\" alt=\"\"><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>Wrong construction plans led to a debacle in the rebuilding of the Afsluitdijk. By properly incorporating commissioning right from the design phase, one can help ensure that these types of setbacks do not have to occur. The expected cost increase is already \u20ac120 million for which the State is making a reservation. The money is [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":1286,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[42],"tags":[37,45],"class_list":["post-1332","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","tag-commissioning-en","tag-failure-costs"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.9 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Wrong construction drawings lead to higher costs of rebuilding Afsluitdijk - D-TACS<\/title>\n<meta name=\"description\" content=\"The debacle on the Afsluitdijk shows that commissioning can help prevent such setbacks from occurring. \u20ac 120 million higher cost because wrong drawings were used for the Afsluitdijk reconstruction. Surely you can draw a lot of hours for that ;-) Too bad this has to be paid for from our tax dollars.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/d-tacs.com\/en\/wrong-construction-drawings-lead-to-higher-costs-of-rebuilding-afsluitdijk\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Wrong construction drawings lead to higher costs of rebuilding Afsluitdijk - D-TACS\" \/>\n<meta property=\"og:description\" content=\"The debacle on the Afsluitdijk shows that commissioning can help prevent such setbacks from occurring. \u20ac 120 million higher cost because wrong drawings were used for the Afsluitdijk reconstruction. Surely you can draw a lot of hours for that ;-) Too bad this has to be paid for from our tax dollars.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/d-tacs.com\/en\/wrong-construction-drawings-lead-to-higher-costs-of-rebuilding-afsluitdijk\/\" \/>\n<meta property=\"og:site_name\" content=\"D-TACS\" \/>\n<meta property=\"article:published_time\" content=\"2023-02-27T10:20:40+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2023-02-27T13:31:01+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/d-tacs.com\/wp-content\/uploads\/2021\/06\/image.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1903\" \/>\n\t<meta property=\"og:image:height\" content=\"404\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Don\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Don\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/d-tacs.com\\\/en\\\/wrong-construction-drawings-lead-to-higher-costs-of-rebuilding-afsluitdijk\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/d-tacs.com\\\/en\\\/wrong-construction-drawings-lead-to-higher-costs-of-rebuilding-afsluitdijk\\\/\"},\"author\":{\"name\":\"Don\",\"@id\":\"https:\\\/\\\/d-tacs.com\\\/en\\\/#\\\/schema\\\/person\\\/7220f5916fd7d4f06d14bc49a26bb25d\"},\"headline\":\"Wrong construction drawings lead to higher costs of rebuilding Afsluitdijk\",\"datePublished\":\"2023-02-27T10:20:40+00:00\",\"dateModified\":\"2023-02-27T13:31:01+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/d-tacs.com\\\/en\\\/wrong-construction-drawings-lead-to-higher-costs-of-rebuilding-afsluitdijk\\\/\"},\"wordCount\":169,\"publisher\":{\"@id\":\"https:\\\/\\\/d-tacs.com\\\/en\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/d-tacs.com\\\/en\\\/wrong-construction-drawings-lead-to-higher-costs-of-rebuilding-afsluitdijk\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/d-tacs.com\\\/wp-content\\\/uploads\\\/2021\\\/06\\\/image.png\",\"keywords\":[\"Commissioning\",\"failure costs\"],\"articleSection\":[\"News\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/d-tacs.com\\\/en\\\/wrong-construction-drawings-lead-to-higher-costs-of-rebuilding-afsluitdijk\\\/\",\"url\":\"https:\\\/\\\/d-tacs.com\\\/en\\\/wrong-construction-drawings-lead-to-higher-costs-of-rebuilding-afsluitdijk\\\/\",\"name\":\"Wrong construction drawings lead to higher costs of rebuilding Afsluitdijk - D-TACS\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/d-tacs.com\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/d-tacs.com\\\/en\\\/wrong-construction-drawings-lead-to-higher-costs-of-rebuilding-afsluitdijk\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/d-tacs.com\\\/en\\\/wrong-construction-drawings-lead-to-higher-costs-of-rebuilding-afsluitdijk\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/d-tacs.com\\\/wp-content\\\/uploads\\\/2021\\\/06\\\/image.png\",\"datePublished\":\"2023-02-27T10:20:40+00:00\",\"dateModified\":\"2023-02-27T13:31:01+00:00\",\"description\":\"The debacle on the Afsluitdijk shows that commissioning can help prevent such setbacks from occurring. \u20ac 120 million higher cost because wrong drawings were used for the Afsluitdijk reconstruction. Surely you can draw a lot of hours for that ;-) Too bad this has to be paid for from our tax dollars.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/d-tacs.com\\\/en\\\/wrong-construction-drawings-lead-to-higher-costs-of-rebuilding-afsluitdijk\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/d-tacs.com\\\/en\\\/wrong-construction-drawings-lead-to-higher-costs-of-rebuilding-afsluitdijk\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/d-tacs.com\\\/en\\\/wrong-construction-drawings-lead-to-higher-costs-of-rebuilding-afsluitdijk\\\/#primaryimage\",\"url\":\"https:\\\/\\\/d-tacs.com\\\/wp-content\\\/uploads\\\/2021\\\/06\\\/image.png\",\"contentUrl\":\"https:\\\/\\\/d-tacs.com\\\/wp-content\\\/uploads\\\/2021\\\/06\\\/image.png\",\"width\":1903,\"height\":404},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/d-tacs.com\\\/en\\\/wrong-construction-drawings-lead-to-higher-costs-of-rebuilding-afsluitdijk\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/d-tacs.com\\\/en\\\/?lang=en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"News\",\"item\":\"https:\\\/\\\/d-tacs.com\\\/en\\\/category\\\/news\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Wrong construction drawings lead to higher costs of rebuilding Afsluitdijk\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/d-tacs.com\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/d-tacs.com\\\/en\\\/\",\"name\":\"D-TACS\",\"description\":\"Onafhankelijke commissioning\",\"publisher\":{\"@id\":\"https:\\\/\\\/d-tacs.com\\\/en\\\/#organization\"},\"alternateName\":\"Dutch Test and Commissioning Specialists\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/d-tacs.com\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/d-tacs.com\\\/en\\\/#organization\",\"name\":\"D-TACS\",\"alternateName\":\"Dutch Test and Commissioning Specialists\",\"url\":\"https:\\\/\\\/d-tacs.com\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/d-tacs.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/d-tacs.com\\\/wp-content\\\/uploads\\\/Logo-D-TACS.svg\",\"contentUrl\":\"https:\\\/\\\/d-tacs.com\\\/wp-content\\\/uploads\\\/Logo-D-TACS.svg\",\"caption\":\"D-TACS\"},\"image\":{\"@id\":\"https:\\\/\\\/d-tacs.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.linkedin.com\\\/company\\\/d-tacs\\\/\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/d-tacs.com\\\/en\\\/#\\\/schema\\\/person\\\/7220f5916fd7d4f06d14bc49a26bb25d\",\"name\":\"Don\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/104910fc868ea0d954ba1c405c8cfb46820391bbaf1c27a2dc895074a1010ac5?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/104910fc868ea0d954ba1c405c8cfb46820391bbaf1c27a2dc895074a1010ac5?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/104910fc868ea0d954ba1c405c8cfb46820391bbaf1c27a2dc895074a1010ac5?s=96&d=mm&r=g\",\"caption\":\"Don\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Wrong construction drawings lead to higher costs of rebuilding Afsluitdijk - D-TACS","description":"The debacle on the Afsluitdijk shows that commissioning can help prevent such setbacks from occurring. \u20ac 120 million higher cost because wrong drawings were used for the Afsluitdijk reconstruction. Surely you can draw a lot of hours for that ;-) Too bad this has to be paid for from our tax dollars.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/d-tacs.com\/en\/wrong-construction-drawings-lead-to-higher-costs-of-rebuilding-afsluitdijk\/","og_locale":"en_US","og_type":"article","og_title":"Wrong construction drawings lead to higher costs of rebuilding Afsluitdijk - D-TACS","og_description":"The debacle on the Afsluitdijk shows that commissioning can help prevent such setbacks from occurring. \u20ac 120 million higher cost because wrong drawings were used for the Afsluitdijk reconstruction. Surely you can draw a lot of hours for that ;-) Too bad this has to be paid for from our tax dollars.","og_url":"https:\/\/d-tacs.com\/en\/wrong-construction-drawings-lead-to-higher-costs-of-rebuilding-afsluitdijk\/","og_site_name":"D-TACS","article_published_time":"2023-02-27T10:20:40+00:00","article_modified_time":"2023-02-27T13:31:01+00:00","og_image":[{"width":1903,"height":404,"url":"https:\/\/d-tacs.com\/wp-content\/uploads\/2021\/06\/image.png","type":"image\/png"}],"author":"Don","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Don","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/d-tacs.com\/en\/wrong-construction-drawings-lead-to-higher-costs-of-rebuilding-afsluitdijk\/#article","isPartOf":{"@id":"https:\/\/d-tacs.com\/en\/wrong-construction-drawings-lead-to-higher-costs-of-rebuilding-afsluitdijk\/"},"author":{"name":"Don","@id":"https:\/\/d-tacs.com\/en\/#\/schema\/person\/7220f5916fd7d4f06d14bc49a26bb25d"},"headline":"Wrong construction drawings lead to higher costs of rebuilding Afsluitdijk","datePublished":"2023-02-27T10:20:40+00:00","dateModified":"2023-02-27T13:31:01+00:00","mainEntityOfPage":{"@id":"https:\/\/d-tacs.com\/en\/wrong-construction-drawings-lead-to-higher-costs-of-rebuilding-afsluitdijk\/"},"wordCount":169,"publisher":{"@id":"https:\/\/d-tacs.com\/en\/#organization"},"image":{"@id":"https:\/\/d-tacs.com\/en\/wrong-construction-drawings-lead-to-higher-costs-of-rebuilding-afsluitdijk\/#primaryimage"},"thumbnailUrl":"https:\/\/d-tacs.com\/wp-content\/uploads\/2021\/06\/image.png","keywords":["Commissioning","failure costs"],"articleSection":["News"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/d-tacs.com\/en\/wrong-construction-drawings-lead-to-higher-costs-of-rebuilding-afsluitdijk\/","url":"https:\/\/d-tacs.com\/en\/wrong-construction-drawings-lead-to-higher-costs-of-rebuilding-afsluitdijk\/","name":"Wrong construction drawings lead to higher costs of rebuilding Afsluitdijk - D-TACS","isPartOf":{"@id":"https:\/\/d-tacs.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/d-tacs.com\/en\/wrong-construction-drawings-lead-to-higher-costs-of-rebuilding-afsluitdijk\/#primaryimage"},"image":{"@id":"https:\/\/d-tacs.com\/en\/wrong-construction-drawings-lead-to-higher-costs-of-rebuilding-afsluitdijk\/#primaryimage"},"thumbnailUrl":"https:\/\/d-tacs.com\/wp-content\/uploads\/2021\/06\/image.png","datePublished":"2023-02-27T10:20:40+00:00","dateModified":"2023-02-27T13:31:01+00:00","description":"The debacle on the Afsluitdijk shows that commissioning can help prevent such setbacks from occurring. \u20ac 120 million higher cost because wrong drawings were used for the Afsluitdijk reconstruction. Surely you can draw a lot of hours for that ;-) Too bad this has to be paid for from our tax dollars.","breadcrumb":{"@id":"https:\/\/d-tacs.com\/en\/wrong-construction-drawings-lead-to-higher-costs-of-rebuilding-afsluitdijk\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/d-tacs.com\/en\/wrong-construction-drawings-lead-to-higher-costs-of-rebuilding-afsluitdijk\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/d-tacs.com\/en\/wrong-construction-drawings-lead-to-higher-costs-of-rebuilding-afsluitdijk\/#primaryimage","url":"https:\/\/d-tacs.com\/wp-content\/uploads\/2021\/06\/image.png","contentUrl":"https:\/\/d-tacs.com\/wp-content\/uploads\/2021\/06\/image.png","width":1903,"height":404},{"@type":"BreadcrumbList","@id":"https:\/\/d-tacs.com\/en\/wrong-construction-drawings-lead-to-higher-costs-of-rebuilding-afsluitdijk\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/d-tacs.com\/en\/?lang=en"},{"@type":"ListItem","position":2,"name":"News","item":"https:\/\/d-tacs.com\/en\/category\/news\/"},{"@type":"ListItem","position":3,"name":"Wrong construction drawings lead to higher costs of rebuilding Afsluitdijk"}]},{"@type":"WebSite","@id":"https:\/\/d-tacs.com\/en\/#website","url":"https:\/\/d-tacs.com\/en\/","name":"D-TACS","description":"Onafhankelijke commissioning","publisher":{"@id":"https:\/\/d-tacs.com\/en\/#organization"},"alternateName":"Dutch Test and Commissioning Specialists","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/d-tacs.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/d-tacs.com\/en\/#organization","name":"D-TACS","alternateName":"Dutch Test and Commissioning Specialists","url":"https:\/\/d-tacs.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/d-tacs.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/d-tacs.com\/wp-content\/uploads\/Logo-D-TACS.svg","contentUrl":"https:\/\/d-tacs.com\/wp-content\/uploads\/Logo-D-TACS.svg","caption":"D-TACS"},"image":{"@id":"https:\/\/d-tacs.com\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.linkedin.com\/company\/d-tacs\/"]},{"@type":"Person","@id":"https:\/\/d-tacs.com\/en\/#\/schema\/person\/7220f5916fd7d4f06d14bc49a26bb25d","name":"Don","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/104910fc868ea0d954ba1c405c8cfb46820391bbaf1c27a2dc895074a1010ac5?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/104910fc868ea0d954ba1c405c8cfb46820391bbaf1c27a2dc895074a1010ac5?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/104910fc868ea0d954ba1c405c8cfb46820391bbaf1c27a2dc895074a1010ac5?s=96&d=mm&r=g","caption":"Don"}}]}},"_links":{"self":[{"href":"https:\/\/d-tacs.com\/en\/wp-json\/wp\/v2\/posts\/1332","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/d-tacs.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/d-tacs.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/d-tacs.com\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/d-tacs.com\/en\/wp-json\/wp\/v2\/comments?post=1332"}],"version-history":[{"count":4,"href":"https:\/\/d-tacs.com\/en\/wp-json\/wp\/v2\/posts\/1332\/revisions"}],"predecessor-version":[{"id":1474,"href":"https:\/\/d-tacs.com\/en\/wp-json\/wp\/v2\/posts\/1332\/revisions\/1474"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/d-tacs.com\/en\/wp-json\/wp\/v2\/media\/1286"}],"wp:attachment":[{"href":"https:\/\/d-tacs.com\/en\/wp-json\/wp\/v2\/media?parent=1332"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/d-tacs.com\/en\/wp-json\/wp\/v2\/categories?post=1332"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/d-tacs.com\/en\/wp-json\/wp\/v2\/tags?post=1332"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}