Projects
Together purposefully towards reliable and efficient building installations
At D-Tacs, we follow a clearly structured commissioning process that focuses on cooperation, clear goals and structured project management. From setting the scope and goals with our commissioning manager to carefully assembling a specialized team: our projects guarantee reliability and optimal performance of all your technical installations. Below is a selection of projects where our approach has made the difference.


Cisco Systems Amsterdam: relocation to a new office
Cisco Systems is leaving its current office, which dates from 2002, and moving to a new location in Amsterdam. D-TACS is carrying out the commissioning of the new office. We test whether the systems work as designed before employees move in.
The project is being delivered in line with LEED and WELL. LEED assesses how sustainable a building is, while WELL looks at the health and comfort of the people who work there. Both require proof that the systems perform in practice: air quality, climate, lighting and energy use are measured and recorded.
Period
2026
- 2027
Client
Cisco Systems


Smart Mobility Hub Amsterdam-Zuidoost
North of the Johan Cruijff ArenA, Heijmans is building the Smart Mobility Hub for the City of Amsterdam. The building replaces the current car parks and will have 2,160 parking spaces for cars and 700 for bicycles. The roof will house a sports park with three football pitches, a padel court and a basketball court, among other facilities. The design is by cepezed and Buro Sant en Co.
D-TACS is carrying out the commissioning of all technical systems in the building on behalf of Equans. The parking area has a flexible layout and has to handle large peaks, for example when a match and a concert finish at the same time. We check that the systems do what was agreed under those conditions.
Image source: http://https//www.cepezednl/projecten/smart-mobility-hub/
Period
2026
- 2028
Client
Equans


Commissioning renovation University Hall, Domplein Utrecht
Dating from 1894, the University Hall is the historic heart of Utrecht University and welcomes around two hundred thousand visitors each year. The renovation makes this national monument more sustainable and accessible, with fully renewed building services and a BREEAM-NL Excellent ambition. On behalf of Utrecht University, we are carrying out the commissioning of the renovated installation in support of BREEAM credits MAN04 (commissioning and handover) and MAN05 (aftercare).
Period
2026
- 2026
Client
Universiteit Utrecht


Utrecht University – Commissioning renovation SL2 building, Utrecht Science Park
The SL2 building on Sorbonnelaan is undergoing a sustainable renovation and will house several chemistry and physics groups of the Faculty of Science. The building is being re-insulated, fitted with heat recovery in the air handling system and connected more efficiently to the thermal energy storage (ATES) ring. On behalf of Utrecht University, we are carrying out the commissioning of the complete installation in support of BREEAM credits MAN04 (commissioning and handover) and MAN05 (aftercare).
Period
2026
- 2028
Client
Universiteit Utrecht

Commissioning of the BESTSELLER Logistics Center West, Lelystad
In Lelystad, BESTSELLER is building Logistics Centre West: at 155,000 m², it will soon be Europe’s largest distribution center constructed from solid wood, with a facade of straw panels serving as insulation. The building is designed to achieve a BREEAM Outstanding rating, the highest certification level. On behalf of Louwers Installatietechniek, we are handling the commissioning of the electrical installation.
Period
2026
Client
Louwers Installatietechniek

Eurocontrol Beek – New MUAC Building
This concerns the construction of the new MUAC Eurocontrol building in Beek. For this project, we were commissioned to commission the entire system.
Period
2026
- 2031
Client
Eurocontrol

KLM – Renovation of Hangar 10 BREEAM Very Good
In 2024, KLM decided to renovate Hangar 10 and adapt it for use by Transavia and KLM, with the goal of obtaining a BREEAM “Very Good” certification. The project has already begun with the removal of the current offices and the gutting of the hangar. Next year, construction of the offices will begin, and the facade of the Hangaar will be completed.
Period
2024
- 2027
Client
KLM

Beveco – BMS system for Interxion AMS11
Commissioning of the BMS system for Interxion AMS11 on behalf of Digital Realty.
Period
2025
Client
Beveco


Education Building – Commissioning of MAN04 and MAN05
The building is being renovated and expanded.
Period
2024
- 2026
Client
Universiteit Utrecht


Drift 21 – Commissioning MAN04 and MAN05
The building is being renovated and adapted for the next generation of students.
Period
2024
- 2026
Client
Universiteit Utrecht

Peregrion – Test site TNO laboratory
Commissioned by TNO, we performed the commissioning for the company Peregrion for a newly built medical laboratory. Here we performed all tests related to the proper commissioning of the laboratory. Such as the specific radiological tests and gas tests.
Period
2025
Client
TNO

MARQ – Test site TNO Automotive BREEAM Very Good
The MARQ building was constructed in Helmond on behalf of TNO. This is a test facility for the automotive industry that has been awarded a BREEAM Very Good rating. We helped carry out all the tests required to achieve a “Very Good” rating.
Period
2024
- 2025
Client
TNO